Kanaka Bridge

Coordinates: 27°32′21″N 88°29′03″E / 27.539123°N 88.484037°E / 27.539123; 88.484037
From Wikipedia, the free encyclopedia
Kanaka Bridge
Kanaka Bridge Under-construction, Sikkim
Coordinates27°32′21″N 88°29′03″E / 27.539123°N 88.484037°E / 27.539123; 88.484037
Carries2 Lanes pedestrians and vehicles
CrossesKanaka River
LocaleManagan (North Sikkim) district of Sikkim
Characteristics
DesignArch Bridge
MaterialSteel and Concrete
Total length255 m (837 ft)
Height160 m (520 ft)
Longest span217 m (712 ft)
Location
Map

The Kanaka Bridge, is an under construction 2 lane bridge over the Kanaka river (near Mantam lake) at Dzongu village in the Mangan subdivision of Sikkim state in India.[1][2]

Kanaka Bridge is a two-lane steel bridge likely to be completed in 2021. The bridge is Under the Road and Bridge Department, Government of Sikkim. The Construction is awarded to Siliguri-based company Mohindra Tubes Limited at the cost of INR 88.5cr. The bridge will be joining the 13 villages and better connectively for Indian army.[3] The bridge runs over river Rongyong damming which Mantam lake was created. The side of the lake is a vast pebbly area where people usually do camp or picnic. The dust created from the pebbles due to weathering of the river is used as sand here. At the end of the bridge there is a village named Kiem and from there if you walk for 3/4 km there is Lingdem Hotspring.

Technical details

[edit]

The technical data of the bridge is as follows:[4]

  • Deck height (height above river bed): 115 m (377 ft), (height above river surface): 160 m (520 ft)
  • Bridge length: 255 m (837 ft),
  • Arch span: 217 m (712 ft)
  • Arch length: 223 m (732 ft)
  • Load capacity: 70R
  • Lane: 2
  • No. of foundation : 2
  • Design approved by: IIT Mumbai

Nearby

[edit]

References

[edit]
  1. ^ "Better connectivity in Sikkim! Two-lane steel bridge over Kanaka river likely to be completed by March 2021". The Financial Express. 16 July 2020.
  2. ^ Dhungel, Pankaj. "13 Dzongu villages cut off since 2016: HC issues fresh directives". EastMojo.
  3. ^ "Minister inspects Dzongu bridge construction work, Mantam-Bey road". Sikkimexpress.
  4. ^ Facilitator, Constro (17 July 2020). "Two-lane steel bridge over Kanaka river likely to be completed by March 2021". Constro Facilitator.